We want to hear your views to help us make our services even better. Here is a list of all of our current consultations.

Have your say

Current consultations

Aster wants to hear your views and make our services better. Here are the ways you can have your say on what we're doing.

We’re in the process of commencing a Section 20 consultation in relation to our intention to undertake external decoration works.

Download the full specification here

PART 1 Preliminaries Drews Park 

PART 2 DREWS PARK Dulux Paint Systems

PART 2 DREWS PARK Repair Care Pricing Template

PART 2 DREWS PARK Repair Care Brochure

PART 3 Specification Drews Park

PART 4 Drawing Issues Sheet Drews Park 

PART 5 PCI Document Drews Park 

Download appendix 1-4 here

Appendix 1 Risk Assessment

Appendix 2 Ownership Drawings issue

Appendix 3 Site Plan and Compound

If you'd like to submit a formal observation please email observations@aster.co.uk by 30 March 2021.

We're in the process of commencing a Section 20 consultation in relation to our intention to enter into a contract for the maintenance of wastewater infrastructure and effluent disposal. 

Click here for the full specification, here for the site list and here for the FAQ’s.

If you would like to submit a formal observation please email observations@aster.co.uk by4th January 2021.

We're in the process of commencing a Section 20 consultation in relation to our intention to enter into a contract for Ground Maintenance and Estate Service works.

Click here for the full specification and here for the FAQ’s.

If you would like to submit a formal observation please email observations@aster.co.uk by 16th December 2020.

We're carrying out a Section 20 consultation about our plans to replace the communal doors and door entry systems for all five blocks in Kingsway Gardens.

View a copy of the full communal doors and door entry system specification here and our consultant's report here.

If you'd like to submit a formal observation please email observations@aster.co.uk by 2 December 2020.

We are conducting a Section 20 consultation in relation to our intention to enter into a contract to support the delivery of emergency lighting testing and inspection with associated remedial works.

The contract being procured will include the following works:

  • A Monthly short duration lighting test. This is a short functional test in accordance with BS EN 50172:2004 and BS 5266-8:2004;
  • Annual full duration lighting test. This will be a full rated duration test to ensure that the emergency lights are still working and producing the acceptable level of light at the end of the test;
  • Associated remedial works and any other occasional ad hoc works.

Download full specification

If you have any questions in relation to the proposed contract or this consultation we would refer you to the Frequently Asked Questions.

If you would like to submit a formal observation please email observations@aster.co.uk by 9 November 2020.

We're in the process of commencing a Section 20 consultation in relation to our intention to enter into a contract to undertake the servicing and repair of various automated door/opening systems. This will include:                                                                                                                 

  • A 24-hour callout facility on automatic door/gate entry and opening systems;
  • Repairs as necessary based on time and materials used;
  • Servicing facility for all automated opening systems in accordance with legislative compliance regulations to ensure Aster remain compliant at all times;
  • The potential installation, partial/complete upgrade/replacement/modernisation of the existing systems.
  •  Click here for the full specification.

If you would like to submit a formal observation please email observations@aster.co.uk by 20th January 2020.

External Stoneworks

We’re in the process of commencing a Section 20 consultation in relation to our intention to appoint a contractor to maintain and repair the external stonework.

Download the full specification here.

Please click on the links below for the sketch drawings referenced in the specification

Sketch drawing 3740-01-20

Sketch drawing 3740-21-40

Sketch drawing 3740-41-60

Sketch drawing 3740-61-80

Sketch drawing 3740-81-90

Site elevations reference plan 

If you would like to submit a formal observation please email observations@aster.co.uk by 12/08/20.

Have your say

Our previous consultations

Here are some of the changes we've made as a result of previous consultations. Thank you to everyone who shared their views with us.

Consultations

Have your Say

Upcoming consultations

We'll let you know about upcoming consultations here.  Let us know if you'd like to get involved.